Comprehensive Building Rehabilitation: How to Plan a Community Project Without Surprises

Por ·

Comprehensive building rehabilitation allows for coordinated addressing of facade issues, waterproofing, insulation, accessibility, and other community needs. We explain how to plan actions, prioritize works, and control budgets and unforeseen events.

Comprehensive Building Rehabilitation: How to Plan a Community Project Without Surprises

A roof leak, facade cracks, an inaccessible elevator, or poor insulation may seem like independent problems. However, when a building accumulates various needs, acting separately is not always the best strategy. A comprehensive building rehabilitation allows for a study of the entire property, setting priorities and coordinating different interventions.

For a community of owners, this planning is especially important. Rehabilitation can affect facades, roofs, waterproofing, insulation, accessibility, or installations and therefore requires coordinated technical, economic, and administrative decisions.

What is comprehensive building rehabilitation?

Comprehensive rehabilitation is an intervention that addresses different elements of a property in a coordinated manner with the aim of recovering or improving its conditions of conservation, safety, habitability, accessibility, or efficiency.

Unlike a punctual repair, it starts from a global vision of the building.

For example, if a community needs to intervene on a facade, it may be a good time to analyze if there are also insulation or humidity problems. Similarly, an intervention in common areas may allow for the study of architectural barriers that have hindered access for years.

This global vision does not mean that all actions must be executed simultaneously. In many cases, the most reasonable approach is to establish intervention phases according to urgency, budget, and technical criteria.

The first step is not to request quotes: it's to know what the building needs

One common mistake is to start a rehabilitation by requesting different quotes without having defined exactly what needs to be executed.

Before comparing companies, it is important to determine the scope of the action.

The Generalitat defines the Technical Inspection of the Building (ITE) as a visual inspection carried out by a competent technician that allows determining the state of the building and guiding the property on the necessary actions to fulfill the duty of conservation and maintenance. Habitatge

This diagnosis is especially relevant in old buildings. In Catalonia, residential buildings over 45 years old are required to undergo the ITE. Habitatge

Therefore, before proposing a major work, it is advisable to have a clear picture of the property's condition.

What actions should be prioritized?

Not all improvements have the same urgency. A community may want to aesthetically renovate the lobby but at the same time have roof leaks or waterproofing problems.

As a general criterion, planning should start with actions related to safety, stability, waterproofing, habitability, and accessibility.

The same Horizontal Property Law establishes the mandatory nature of the necessary works for the proper maintenance and fulfillment of the duty of conservation of the property, including those related to safety, habitability, and universal accessibility. BOE

Afterwards, interventions aimed at improving the building's features can be considered: thermal and acoustic insulation, energy efficiency, renovation of finishes, or modernization of certain installations.

Rehabilitate in phases or execute a comprehensive work?

There is no single answer.

Rehabilitating in phases can facilitate the community to distribute the investment over several years. It can be an appropriate option when the different actions are independent and there are no urgent deficiencies.

A comprehensive intervention, on the other hand, may make sense when various actions are related.

Imagine scaffolding needs to be installed to work on a facade. If the building also needs to improve its external insulation, studying both needs together can avoid duplicating certain operations.

The decision should be made based on technical and economic criteria, not just by comparing the initial cost of each action.

How to prepare a realistic budget for the community?

To correctly compare quotes, all companies should assess the same scope of work.

The document should clearly identify the different items: materials, labor, auxiliary systems, waste management, and other necessary works.

It is also important to know what is excluded from the budget.

An initially lower amount ceases to be advantageous if during execution works appear that were foreseeable but not included.

Therefore, before the board decides, the administrator and the involved technicians should be able to compare the proposals on equal terms.

How to avoid deviations and problems during the work?

A well-prepared rehabilitation needs more than just an approved budget.

Responsibilities, phases, schedule, communication with neighbors, and execution monitoring must be defined.

It is also advisable to document the interventions carried out. The maintenance documentation linked to the Technical Building Code indicates the need to properly maintain the building, carry out the regulatory inspections, and document repair, renovation, or rehabilitation interventions during its useful life. Habitatge

This history can be very useful years later when a new issue arises or another intervention needs to be scheduled.

Accessibility, waterproofing, and insulation: looking beyond repair

Rehabilitation is also an opportunity to consider whether the building is prepared for the current needs of its residents.

Eliminating architectural barriers, installing or adapting an elevator, improving insulation, or definitively resolving humidity problems can add more long-term value than merely repairing visible symptoms.

Additionally, certain actions may have public aid available. The Catalonia Housing Agency maintains specific information on programs related to accessibility, rehabilitation, and energy efficiency improvement. Calls and requirements should be checked when planning each project. Habitatge

Construalamo's vision: coordinating different needs in a single project

In complex rehabilitations, coordination between different works becomes an important part of the project.

Construalamo Obres i Projectes works precisely in areas that may coincide in a global rehabilitation: building rehabilitation, comprehensive renovations, waterproofing, insulation, elevator installation, and elimination of architectural barriers, among other actions. ForConnect

This type of approach allows analyzing the work not just as a specific repair, but as a set of interventions that must be properly coordinated.

Construalamo and ForConnect

Construalamo is part of the ForConnect network of professionals and offers building renovation and rehabilitation services with coverage indicated in Catalonia. ForConnect

For property managers and communities, having specialized professionals allows for contrasting needs, better defining the scope of works, and requesting quotes tailored to each project.

If your community needs to undertake a rehabilitation, renovation, or building improvement action, at ForConnect you can find verified professionals and request a quote for the project.